CES Airmen remove runway rubber, ensures aircrew safety
Two vehicles from the 97th Civil Engineer Squadron Dirt Boyz drive to remove rubber off the runway on September 12, 2020, at Altus Air Force Base, Oklahoma. The rubber removal process takes an average of 12 total hours to complete with each end of the runway taking six hours. (U.S. Air Force photo by Senior Airman Breanna Klemm)
PHOTO BY:
Senior Airman Breanna Klemm
VIRIN:
200912-F-XN197-0158.JPG
FULL SIZE:
1.29 MB
CAMERA
NIKON D850
LENS
24.0-70.0 mm f/2.8
APERTURE
28/10
SHUTTERSPEED
1/1250
ISO
200
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.